Lead-Free Chicago

Lead-Free Chicago replaces about 412,000 lead service lines, the pipes that run from the water main under the street into your building. The city replaces about 8,000 in Year 1, then at least 20,000 a year, more than double the pace of the city's current plan, so every lead line is out before the federal deadline. Each line is budgeted at $10,000 instead of the roughly $31,000 Chicago pays now.

← ALL POLICIES

PART OF THE NEW BURNHAM PLAN

CONSTRUCT · FOUNDATION

Lead-Free Chicago

Every lead water line in Chicago comes out before the federal deadline, decades ahead of the city's plan.

Chicago has about 412,000 water lines that are lead or have to be replaced, and the city's own plan finishes in 2076, when a kid born this year turns fifty. Owners who go through the city program get no bill for the replacement. A surcharge on the water bill pays for it, and the surcharge ends when the last pipe is out.

There's no safe level of lead for a child's brain, and Chicago did this to itself: the building code required lead service lines until 1986. Whether you own or rent, your family should get its water through a safe pipe.

The city pays about $31,000 a line, mostly because it digs one line at a time and restores the street every time. Newark replaced more than 23,000 lines in under three years for about $8,200 each. The difference was organization: mandatory replacement, the authority to do the work, and crews moving block by block.

So we organize the work. Lead lines become illegal and owners get 90 days' notice. Crews work whole blocks, starting where young kids are most exposed. Every building permit triggers a lead check. And whenever a street is opened for a rebuild, a water main or a sewer, the lead lines come out in the same trench, so the same money replaces more lines.

Here is the pace: about 8,000 lines in Year 1 while crews are hired and trained, then at least 20,000 a year, more than double the city's plan, and climbing as the cost per line comes down. We budget $10,000 a line, so the money the city already spends goes more than three times as far. For a house, a new water surcharge of about $14.50 a month (a campaign estimate) pays for it.

WHAT IT WON'T DO

It doesn't hand owners a bill for the pipe. You get 90 days' notice, and through the city program there's no replacement bill.

It isn't a forever charge. The surcharge ends when the last lead line is out, and the only borrowing is low-interest water loans that the surcharge itself repays.

It doesn't touch your property tax. Lead lines are paid through the water system, not the Remodel Fund (the neighborhood line on your property tax).

It doesn't dig up your street again and again. Lead lines come out in the same trench whenever your block is opened for other work, and crews pull new pipe through underground wherever the ground allows.

It doesn't make water safe overnight, and it doesn't cover the pipes inside your house. Until your line is replaced, filters and flushing still matter.

How it connects

Nothing in this plan works alone. These are the questions people ask next, and the policies that answer them.

Who's going to do all this work? The Chicago Trades Pipeline trains Chicagoans with the unions, including a dedicated lead-line crew of several hundred workers at 20,000 lines a year, and city lead-pipe contracts require crews that are at least half Chicago residents.

Chicago Trades Pipeline →

Will my street get dug up more than once? No. Paved Paradise rebuilds every layer of a street in one dig, and no block is repaved if utility work is due within five years.

Paved Paradise →

What does the job pay? The Dignity Wage sets Chicago's minimum wage for adults at $30.53 an hour, 120% of what it costs one adult to live in Cook County.

Dignity Wage →

FISCAL IMPACT

Investment Cost

RENOVATION STEP

Construct · Foundation

SHOW THE FULL POLICY DETAILS

01

Where it ranks

OUR PRIORITIES

#6 of 33

TOP PRIORITY

72.5 / 100

Daily life

Long-term future

Reach

Unlocks

PROVEN Replacing every lead service line, the water line that runs into a home, means safe water in every home for good.

When you'd feel it: Year 2.

See all the priorities

How I set them

02

How it works

Lead lines become illegal

A city ordinance bans lead service lines, the pipe that runs from the water main under the street into your building. Owners get notice and have 90 days to replace the line or join the city program. Owners who go through the city program get no bill for the replacement.

When an owner can't be reached

If an owner can't be found or won't respond, the city can do the work with the tenant's consent. That power takes a change in state law, like the one New Jersey passed so Newark could do the same. In Year 1 the city asks the state for it.

Block by block

City-led crews replace whole blocks at a time, starting where children under 6, high blood-lead test results, low incomes, daycares and schools are concentrated. The city runs 50 to 75 crews of its own and bids out the rest, the hybrid model Detroit used. Crews use trenchless methods, which pull the new pipe through underground, wherever the ground allows.

Every building permit

Any building permit triggers a lead check. If the line is lead, replacing it becomes a condition of the permit. The owner hires a licensed contractor of their choice, and the city gives a $5,000 credit toward the cost.

Whenever a street is opened

Lead lines come out wherever a street is opened: during full street rebuilds and water-main and sewer work under Paved Paradise, the plan to rebuild each street once with all its layers together. Standalone crews also work on blocks with no other work scheduled. Full rebuilds alone touch only about 4,500 lead lines a year, so the city doesn't wait for a rebuild to replace a lead line. Replacing a line costs far less when the street is already open.

The pace

Crews replace about 8,000 lines in Year 1 while they are hired and trained. From Year 2, they replace at least 20,000 a year, more than double the city's own plan of 8,300 a year, and the pace keeps climbing as the cost per line comes down. That gets every lead line out before the roughly mid-2049 federal deadline Chicago is expected to face, decades ahead of the city's 2076 plan.

How it's paid for

The money comes from three sources, all tied to the water system. The city keeps spending what it already spends on lead lines; at $10,000 a line instead of about $31,000, that money goes more than three times as far. A Water Infrastructure Surcharge, an added charge on water bills, adds to it and ends when the last line is out. Low-interest water-system loans (the state revolving fund and the federal Water Infrastructure Finance and Innovation Act program, known as WIFIA), repaid by the surcharge, speed up the early years. Lead lines last a century, so the loans match the money to the life of the pipe. Lead lines are not paid from the Remodel Fund, the plan's neighborhood fund on the property tax.

Who does the work

The Chicago Trades Pipeline, the plan's program for training workers in the trades, trains Lead Service Line Technicians and laborers, paid the full Dignity Wage floor, the plan's minimum wage for adults, of about $63,500 a year full time ($30.53 an hour), with that wage cost paid from the surcharge. Half the workforce on city lead-pipe contracts must be Chicago residents, and people coming home from prison and people out of work a long time get priority placement. The policy's 850-to-1,000-worker figure was sized for 30,000 lines a year; at 20,000, the need is roughly two-thirds of that.

03

What it costs

Planning budget per line

$10,000

Chicago's average today (2021–2025)

About $31,000

Needed each year at 20,000 lines

About $200M (campaign estimate)

Water surcharge, the policy's current tiers

$8 a month single-family; $12 for 2–4 units; $20 for 5+ units; $35–100 commercial and industrial

Surcharge increase to carry 20,000 lines a year

Roughly $5–8 a month per account on average (campaign estimate)

City credit on the building-permit track

$5,000 per line

Program cost (about 412,000 lines at $10,000 each)

About $4.1 billion

The program is paid for by the city's current lead-line spending, kept at today's level, by the surcharge, and by low-interest water-system loans repaid by the surcharge. The surcharge ends when the last lead line is out. Loan interest isn't in the $4.1 billion. Exact surcharge amounts are published once the revenue estimate is rebuilt from the city's 494,384 water accounts. The city takes federal and state grant money when it's available but doesn't count on it.

04

What it takes to make it happen

CITY COUNCIL

Pass the ordinance that bans lead service lines, sets the 90-day notice, makes replacement part of any building permit with the $5,000 credit, requires 50% Chicago residents on lead-pipe contracts, and adds the water surcharge with its end date.

SPRINGFIELD

Pass a law that lets the city enter a property to replace a lead line when the owner can't be reached or won't respond, with the tenant's consent. In Year 1 the city asks for it.

MAYOR AND DEPARTMENT OF WATER MANAGEMENT

Stand up 50 to 75 city crews, bid out the rest, rank blocks by exposure of young children, and replace lead lines whenever a street is opened on Paved Paradise's schedule.

LENDERS

Provide low-interest water-system loans from the state revolving fund and the federal WIFIA program, repaid by the surcharge.

WASHINGTON

No federal grant is counted in the plan. Any federal grant money still available gets used, but the plan doesn't depend on it.

VOTERS

No referendum is needed.

05

Timeline

DAY ONE

Lead service lines are declared illegal, and the state bill that would let the city enter a property to replace a lead line is filed. The first blocks start where young children are most exposed.

YEAR 1

This is a ramp-up year while crews are hired and trained. About 8,000 lines are replaced, both wherever a street is opened and by standalone crews.

YEAR 2 ONWARD

Crews replace at least 20,000 lines a year, more than double the city's plan.

AFTER THAT

The pace keeps climbing as the cost per line comes down. Every lead line is out before the roughly mid-2049 federal deadline. The surcharge ends when the last line is out.

06

Where it's worked

Chicago today

Chicago replaced about 15,000 lead lines from 2021 through 2025. Only 3% were done as whole blocks; the rest went one at a time, mostly during leak and break repairs. The average cost was about $31,000 a line: $34,000 on block jobs and $39,000 on one-off jobs.

SOURCE: WBEZ, JUNE 30, 2026 ↗

(OPENS IN A NEW TAB)

Chicago today

The city's current plan replaces 8,300 lines a year for 50 years starting in 2027, finishing in 2076. The federal rule would require nearly 20,000 a year starting in 2027, and Chicago's deadline is around mid-2049.

SOURCE: INSIDE CLIMATE NEWS, JUNE 26, 2025 ↗

(OPENS IN A NEW TAB)

Chicago today

As of September 2025, only $70–90 million of a $325 million federal loan for lead-line work had been spent since it was finalized in 2023. The loan expires at the end of 2026. The water department said it was on pace to replace 8,000 lines in 2025.

SOURCE: WTTW, SEPT. 23, 2025 ↗

(OPENS IN A NEW TAB)

Newark

Newark replaced more than 23,000 lead lines in under three years starting in March 2019. A voluntary program with a $1,000 owner share did 650 lines in six months. After a September 2019 ordinance made replacement mandatory and free, crews did 80 to 100 a day.

SOURCE: ENVIRONMENTAL POLICY INNOVATION CENTER, "ECHOING NEWARK" ↗

(OPENS IN A NEW TAB)

Newark

Newark spent $190 million to replace all 23,000 lead lines, about $8,200 a line.

SOURCE: THE FULCRUM, "NEWARK OFFERS TIPS FOR CHICAGO EFFORTS TO REPLACE LEAD LINES" ↗

(OPENS IN A NEW TAB)

Detroit

Replacing lines with city crews saves about $3,700 a line compared with the $13,000 contractor price at the time. Detroit scaled up to 8,000 lines a year, at no cost to customers.

SOURCE: CITY OF DETROIT, WATER AND SEWERAGE DEPARTMENT ↗

(OPENS IN A NEW TAB)

07

Sources

WBEZ, June 30, 2026

Inside Climate News, June 26, 2025

WTTW, Sept. 23, 2025

Environmental Policy Innovation Center, "Echoing Newark"

The Fulcrum, "Newark offers tips for Chicago efforts to replace lead lines"

City of Detroit, Water and Sewerage Department

WHAT YOU CAN DO

Look up whether the pipe bringing water from the street into your home is lead at sli.chicagowaterquality.org. If it is, filtering and flushing your water matter until it's replaced. Under my plan, the city program replaces it with no replacement bill. Crews start on the blocks with the most young children and the highest blood-lead levels, and lead lines come out whenever your street is opened for other work. A water surcharge pays for the work alongside what the city already spends, and it ends when the last lead line is out. If you want the job, the Chicago Trades Pipeline, the plan's construction job-training program, trains lead technicians and pays at least the Dignity Wage, the plan's minimum wage of about $63,500 a year full time ($30.53 an hour).

← BACK TO POLICIES