Connect the Lake builds a deck, called a cap, over about a mile and a half of Lake Shore Drive between North Avenue and Diversey, and creates a new lakefront neighborhood on top: a park, a boardwalk, and new homes and shops on land the city keeps.
← ALL POLICIES
PART OF THE NEW BURNHAM PLAN
CONSTRUCT · ROOMS
Connect the Lake
I want to reconnect the lakefront to the neighborhoods next to it, with a park, a boardwalk and new homes on a deck over Lake Shore Drive.
The deck would run from North Avenue to Diversey, with the Drive still running underneath. Daniel Burnham gave Chicago a lakefront for everyone, and then we ran a highway along it. It's a long-term idea, not a first-term promise.
Between North Avenue and Diversey, Lake Shore Drive cuts Lincoln Park's neighborhoods off from the park and the water. You reach the lake through underpasses and hear the traffic from blocks away.
The cap, a deck built over the highway, covers about a mile and a half of the Drive and is 200 to 250 feet wide. On top is new land: a boardwalk on the lake with restaurants and water taxi stops, a linear park at least 100 feet wide, and homes and shops along the western edge. There are no cars on the deck. CTA buses stop below, with elevators and stairs up.
The city keeps the land and leases parcels of it to developers for 99 years, with affordable housing required in every lease. At full buildout the new neighborhood is projected to pay $275 to $350 million a year in rent and property taxes across the city, the schools, the parks and the county; the city's own share is smaller. The city's share of the cost of the deck, roughly $925 million to $1.45 billion, would be paid mainly with bonds (money the city borrows), with the rent developers pay for the land helping pay them back. Before it goes anywhere, it needs a full financing plan, including who covers any gap between the rent and the bond payments.
Down the road, the same idea can reconnect the neighborhoods the Dan Ryan and the Eisenhower cut apart. That's a long-term goal, not a first-term promise.
WHAT IT WON'T DO
It doesn't take parkland. The buildings sit over the highway, not the park.
It doesn't take away the Drive. Traffic keeps moving underneath, and trucks deliver from loading docks down at that level.
It doesn't sell the lakefront. The city keeps the land, and the buildings become city property when the leases end.
It doesn't let developers sit on the land. Construction has to start within 6 months of the deck being finished, or the city can end the lease and the developer loses its deposit.
How it connects
Nothing in this plan works alone. These are the questions people ask next, and the policies that answer them.
Does this add new homes? Yes, along the western edge of the deck. Housing Abundance is the plan's broader push to let more homes get built across Chicago.
Housing Abundance →
How do people get around a neighborhood with no cars? Low-speed vehicles are small electric vehicles for short trips, already legal on Chicago streets with speed limits of 30 mph or less.
Low-Speed Vehicles →
Why lease the land instead of selling it? The Public Assets Protection Act keeps the city's water system, streets, parks and lakefront from ever being sold, and sets strict tests for long leases of other city assets.
Public Assets Protection Act (PAPA) →
What about the Dan Ryan and the Eisenhower? City in a Garden puts a park, a garden or a green boulevard in every neighborhood, starting with the ones that got left out.
City in a Garden →
FISCAL IMPACT
Investment Cost
RENOVATION STEP
Construct · Rooms
SHOW THE FULL POLICY DETAILS
01
Where it ranks
OUR PRIORITIES
#25 of 33
MEDIUM
41.3 / 100
Daily life
Long-term future
Reach
Unlocks
PROMISING It covers about a mile and a half of Lake Shore Drive with a cap and builds a new lakefront neighborhood on top, on land the city keeps. It is a long-term idea, not a first-term promise.
When you'd feel it: Year 5 or later.
See all the priorities
How I set them
02
How it works
The cap
The plan builds a deck over Lake Shore Drive from North Avenue to Diversey, about a mile and a half long and 200 to 250 feet wide. The Drive keeps running underneath. The deck creates 36 to 45 acres of new land on top, roughly half of it for buildings.
What goes on top
Buildings go along the west edge, next to the existing neighborhood, with heights set by a master plan; some parcels could hold towers of 45 to 50 stories. Every lease requires shops or restaurants on the ground floor. A linear park at least 100 feet wide runs down the middle. A boardwalk on the east edge has restaurants, performance space and water taxi stops. The policy estimates 8 to 12 million square feet of building space.
No cars on the deck
Trucks deliver from loading docks at the level of the Drive below. CTA buses stop underneath, with elevators and stairs up. Parking garages sit at the North Avenue and Diversey ends. Low-speed vehicles circulate on top.
No gas lines
Every building is all-electric. A shared geothermal system is explored from the start, with wells drilled while the deck is built. Net-zero energy, where the buildings produce as much energy as they use, is a design goal, not a promise.
The city keeps the land
Developers bid on 99-year ground leases for individual parcels, meaning the city keeps the land and rents it to them. They sign, with a deposit, before the deck is built. Construction has to start within 6 months of the deck being finished and be substantially complete within 36 months, or the city can end the lease and the deposit is lost. Rents reset to market value at set intervals, typically every 25 years. The buildings become city property when the lease ends. Every lease includes affordable housing requirements.
Closing the Drive
Whether to close the Drive during construction is decided from engineering studies and real bids. Extended lane closures at North Avenue and Diversey are likely for utility connections either way.
Paying the city's share
The city pays for the deck mainly with bonds, plus any state and federal help it can win, not out of the Chicago Remodel Fund (the neighborhood fund on the property tax) alone. Ground rent from the parcels helps repay the bonds.
Worth it even if it costs money
Ground rent won't repay the whole deck, and it doesn't have to. Capping the Drive reconnects Lincoln Park's neighborhoods to their own lake, takes the highway noise off the blocks next to it, and builds a whole new neighborhood, with new homes and new taxpayers for the schools, the parks and the county. Chicago already pays for public projects with far less to show for them: taxpayers still owe hundreds of millions on the 2002–03 Soldier Field renovation.
The expressways next
The same idea can reconnect neighborhoods the expressways cut apart. Caps over sections of the Dan Ryan and the Eisenhower are a long-term aspiration in the City in a Garden policy, the plan to bring parks, gardens and nature to every neighborhood. They are pursued if federal money is offered. They aren't a first-term promise.
03
What it costs
Structural deck and foundations
$600–900M
Linear park and boardwalk
$150–250M
Utilities built into the deck
$75–125M
Planning, design and project management
$50–75M
Shared geothermal system, if pursued
$50–100M
City's up-front cost
$925M–1.45B
At full buildout the policy projects $275–350 million a year in ground rent and property taxes. That's new money for the city, Chicago Public Schools, the Park District and Cook County. Ground rent is $15–20 million of it in the conservative case, and the city's part of the property taxes is roughly a quarter of the rest.
04
What it takes to make it happen
SPRINGFIELD
Pass a state law that gives the city the right to build over the Drive, either by transferring that stretch to the city or by granting development rights, so the project is clearly authorized and holds up in court. The policy says the Illinois Department of Transportation (IDOT) owns the Drive.
CITY COUNCIL
Approve the master plan, the bonds and each 99-year lease (leases over 10 years need Council approval under the Public Assets Protection Act, which requires an independent valuation, competitive bidding and a City Council vote before a public asset is sold or leased long term), plus Plan Commission review under the Lakefront Protection Ordinance.
CHICAGO PARK DISTRICT
The deck runs along Lincoln Park, and the boardwalk and park connections tie into Park District land.
WASHINGTON
The Drive is part of U.S. 41, so federal highway rules on building over a highway are checked before design.
VOTERS
No referendum is needed.
05
Timeline
YEARS 1–2
The city negotiates with the state and IDOT. Master planning, which takes 12 to 18 months, can happen at the same time.
DURING PLANNING
Developers bid on parcels and sign leases, which takes 6 to 12 months, before any deck construction starts.
YEAR 3–4 AT THE EARLIEST
Deck construction begins, if the state agrees quickly. It takes 24 to 36 months.
YEAR 6–7 AT THE EARLIEST
The first buildings are finished. Building construction runs 2 to 4 years, in phases.
10–15 YEARS
The project reaches full buildout, at a pace set by how fast the market fills the parcels.
06
Where it's worked
Dallas
Klyde Warren Park is a 5.4-acre park on a deck over the Woodall Rodgers Freeway. It opened in October 2012 and cost $112 million: $20 million from the city, $20 million in state highway funds, $16.7 million in federal stimulus money, and the rest from private donors.
SOURCE: KLYDE WARREN PARK, OUR STORY ↗
(OPENS IN A NEW TAB)
Columbus, Ohio
The Cap at Union Station put shops and restaurants on bridges over Interstate 670: about 25,500 square feet of leasable space on 1.1 acres, opened in October 2004 for $7.8 million. It shows buildings can sit on a highway cap, at a much smaller scale.
SOURCE: URBAN LAND INSTITUTE CASE STUDY ↗
(OPENS IN A NEW TAB)
New York (Hudson Yards)
Hudson Yards, built over rail yards, was financed on future tax revenue. By 2017 that revenue had fallen short and New York City had paid about $359 million in interest support, with more capital money still needed.
SOURCE: NYC INDEPENDENT BUDGET OFFICE, JUNE 2017 ↗
(OPENS IN A NEW TAB)
Chicago today
The Illinois Department of Transportation (IDOT) and the Chicago Department of Transportation (CDOT) are jointly studying a rebuild of North Lake Shore Drive between Grand Avenue and Hollywood Avenue, a stretch that includes North Avenue to Diversey.
SOURCE: IDOT, NORTH LAKE SHORE DRIVE PROJECT STUDY ↗
(OPENS IN A NEW TAB)
Chicago
The public still owes $534.4 million in principal and interest on the 2002–03 Soldier Field renovation, which cost $632 million. When the hotel taxes backing the bonds fall short, part of Chicago's share of state tax revenue covers the gap.
SOURCE: FORBES, SEPTEMBER 12, 2025 ↗
(OPENS IN A NEW TAB)
07
Sources
Klyde Warren Park, Our Story
Urban Land Institute case study
NYC Independent Budget Office, June 2017
IDOT, North Lake Shore Drive project study
Forbes, September 12, 2025